NRC CAL – NOV (White / SLIII)

EA-10-205 · CAL · Severity SLIII · Issued 2010-12-07 · Reactor Licensees

Action

EA Number
EA-10-205
Licensee
NOV (White / SLIII)
Category
Reactor Licensees
Action type
CAL
Severity level
SLIII
Date issued
2010-12-07

Description

On December 7, 2010, the NRC issued a White finding with associated violation and Notice of Violation (NOV) for a Severity Level III violation to Carolina Power and Light Company (doing business as Progress Energy Carolinas Inc (PEC)) as a result of inspections at the H.B. Robinson Steam Electric Plant Unit 2. The White finding involved the failure to identify and correct a problem associated with the "B" Emergency Diesel Generator (EDG) output breaker in 2008. Again in 2009, a similar malfunction caused the EDG to be declared inoperable for a period greater than Technical Specifications. A 10 CFR 50.9, "Completeness and Accuracy of Information," NOV for a Severity Level III violation was also assessed for submitting materially inaccurate information. PEC provided information which stated that the breaker was tested in accordance with a maintenance procedure. However, the NRC determined that they had not conducted full testing in accordance with the procedure, and only completed the instructions for returning the breaker to service.

Source

Full letter
PDF on NRC ADAMS
NRC index
Reactor Licensees enforcement actions